A production frame on a workshop bench under inspection lighting
Certification · the compliance matrix

Certificates need samples. The programme does not.

Kinley states ISO 9001. Steora states CE. Until a production sample exists we cannot state a certificate number, and we will not imply one. What we can publish is the whole programme: eight standards, the clause each answers, the test house, the sample count, the cost and where it sits in the build sequence. The certificate column below is empty on purpose, and it fills in public.

8

Standards in the programme

Committed

4

Packs complete before manufacture

Verified

29.7k

GBP total programme cost

Estimated
The matrix

Eight lines, 29,750 GBP across the eight lines above, sequenced against sample availability.

Nothing here is aspirational. Each line is priced from a published rate card and scheduled against the first production frame, the enclosure tool or the first battery pack, whichever gates it.

StandardScopeClauseTest houseSamplesCostSequenceStatusCertificate no.
BS EN 581-1 and 581-3Outdoor seating and table strength, durability and stability581-1 cl. 5 safety, 581-3 cl. 6 table stability and cl. 7 strengthUKAS furniture test house, Nottingham or Wrexham rate card2 production frames, one destructive3,900 GBPFirst production frame, week 1 of sample availabilityScheduledNot yet held
IEC 62109-1 and 62109-2Safety of the charge controller and power conversion assembly62109-1 cl. 7 protection against electric shock, cl. 13 componentsNotified body electrical laboratory, UK2 conversion assemblies6,400 GBPRuns in parallel with the frame test on the bench-top stackPack readyNot yet held
BS EN 60529 to IP65Enclosure ingress for the battery bay, controller bay and socket facescl. 13.4 dust, cl. 14.2.5 water jetSame electrical laboratory, ingress rig1 production enclosure set1,850 GBPAfter the enclosure tool is signed offScheduledNot yet held
UN 38.3 and IEC 62133-2Battery pack transport safety and cell-level safety38.3 T1 to T8, 62133-2 cl. 7 safety requirementsBattery test house via the pack integrator8 cells and 2 packs5,200 GBPOrdered with the first production pack, eight-week leadScheduledNot yet held
BS EN 62262 to IK08Impact resistance of enclosures and socket faces in the public realmcl. 6 impact energy 5 JUKAS mechanical laboratory3 faces1,100 GBPWith the ingress programme, same sample setScheduledNot yet held
BS EN 1991-1-4 calculationCanopy wind uplift and ballast, terrain category IVcl. 7.3 canopy roofs, National Annex site factorsChartered structural engineer sign-off, no laboratory requiredCalculation pack only2,400 GBPComplete now, independent of manufacturePack readyNot yet held
UKCA and CE technical fileConformity route for the powered assembly placed on the UK and EU marketSupply of Machinery Regs, EMC Regs 2016, RoHS, plus EU equivalentsSelf-declaration on the notified-body test evidence aboveDocumentation1,600 GBP legal reviewFile assembled now, signed on receipt of the test reportsPack readyNot yet held
ISO 9001:2015Manufacturing quality management at the Manchester linecl. 8.5 production control, cl. 8.7 nonconforming outputUKAS certification body, stage 1 and stage 2 auditProcedures and records7,300 GBP first cycleGap analysis complete now, audit at three months of production recordsPack readyNot yet held

Swipe the table sideways to see every column

Committed
Conformity route

Why the file looks like this, written so it can be argued with.

A conformity route is a set of decisions, and decisions can be wrong. These are ours, stated with the reasoning attached so an assessor can challenge the reasoning rather than guess at it.

The bench is a powered product, not a machine with moving parts

There is no hazardous motion, so the Machinery route is limited to the electrical and battery assembly. That keeps conformity inside EMC, RoHS, low voltage and battery transport rather than a full machinery file.

Nothing above 48 V DC leaves the enclosure

Array strings are kept under the low voltage threshold, and the public-facing outputs are 5 V and 20 V USB-C only. No 230 V socket appears in the public realm, which is also the insurer's condition.

Second-life modules are treated as components, not as certified product

Each reclaimed module is flash-tested at intake and recorded against a serial. The assembly is certified, the module is a graded component with a stated output floor. That is the same logic a reconditioned motor carries.

UKCA first, CE on the same evidence

The technical file is written once. UKCA is declared for the UK market and CE for the EU on the identical notified-body reports, which avoids a second test programme when we quote outside the UK.

ISO 9001 gap analysis

Our own procedures, measured against the standard, findings published.

Publishing a gap analysis is unusual. It is also the only version of a gap analysis worth anything, because a private one can be quietly failed.

cl. 7.5 documented information
Finding
Drawings and revisions held in the design register, no formal issue control
Corrective action
Adopt a numbered issue sheet per drawing before the first production run
cl. 8.4 externally provided processes
Finding
Moulder, pack integrator and module supplier not yet on an approved vendor list
Corrective action
Approved vendor list with re-approval on a twelve-month cycle
cl. 8.5.2 identification and traceability
Finding
Module serial capture designed, not yet procedurally mandated
Corrective action
Serial and flash-test result recorded against bench build number, no exceptions
cl. 9.1 monitoring and measurement
Finding
Field data will exist only once units are deployed
Corrective action
Fleet telemetry nominated as the cl. 9.1 evidence source, defined before deployment
cl. 10.2 nonconformity and corrective action
Finding
No formal corrective action log
Corrective action
Log opened now, carrying the scale prototype test runs as its first entries
Verified

Where this sits

This matrix closes the certification row on the differentiation roadmap as far as it can be closed before a sample exists, and it answers the position set out on the competitor watch page.