The majors win because they are easy to buy from. So this is published, not requested.
Furnitubes and Environmental Street Furniture do not beat us on watts. They beat us because a buyer can find a specification, a warranty, insurance certificates and a framework route without emailing anyone. Everything on this page is the pack that closes that gap: paste the specification into a tender, read the terms, check the route for your value band, and see the social value calculation rather than a claim about it.
18
Specification lines, tender ready
Verified10
Commercial documents held
Verified12 wk
Lead time, first unit
CommittedOne page a buyer can paste straight into a specification document.
Dimensions, loads, outputs, standards, warranty, lead time and price. No adjectives, and no figure here that is not also on a technical page with its derivation attached.
- Specified value
- Canopei solar canopy bench, seat-and-canopy format, four reclaimed modules
- Specified value
- 2,100 mm long, 1,860 mm canopy width, 2,240 mm to canopy underside
- Specified value
- 460 mm seat height, 420 mm depth, 2,000 mm usable seating run
- Specified value
- 4 graded second-life modules, 1,200 to 1,600 W nameplate depending on intake grade
- Specified value
- 2.4 kWh LFP pack, IP65 bay, BMS with cell balancing and thermal cut-out
- Specified value
- 4 x USB-C PD to 20 V 60 W, 2 x USB-A 5 V, IP66 faces, no 230 V in the public realm
- Specified value
- Canopy underside LED, 380 lm nominal, dusk sensor, dimmed before shed
- Specified value
- EN/ABEL mesh node, 868 MHz, control plane only, no personal data captured
- Specified value
- Galvanised steel spine, 3.0 kN/m distributed seat load, 12 mm maximum deflection
- Specified value
- BS EN 1991-1-4 terrain IV, 0.68 kN/m2 net uplift, 240 kg ballast per canopy pair
- Specified value
- Hemp-plastic composite planks and machined reclaimed timber slats
- Specified value
- BS EN 581, IEC 62109, IP65, IK08, UN 38.3, UKCA and CE technical file
- Specified value
- By subsystem, 5 to 15 years, published schedule, second-life output floor stated
- Specified value
- Two inspections a year, 46 GBP per bench per year, plank-level host repair
- Specified value
- Greater Manchester, United Kingdom
- Specified value
- 12 weeks from order for the first unit, 6 weeks for repeat orders
- Specified value
- Pilot 1 to 5 units 4,850 GBP each; 6 to 24 units 4,380 GBP; 25 and above 3,940 GBP
- Specified value
- Event and seasonal hire from 240 GBP per bench per week, delivered and collected
Four value bands, four routes, honest timescales for each.
The first order is deliberately scoped under the direct-award ceiling. Not to avoid scrutiny, but because a four-month framework qualification should not stand between a high street and a working bench.
- Route
- Direct award against borough highways or parks minor works
- Realistic timescale
- 4 to 6 weeks from enquiry to order
- Evidence needed
- Specification sheet, insurance certificates, RAMS
- Route
- Three-quote mini competition under standing orders
- Realistic timescale
- 8 to 12 weeks
- Evidence needed
- Full commercial pack plus social value method statement
- Route
- ESPO furniture framework, or Greater Manchester dynamic purchasing entry
- Realistic timescale
- 4 to 6 months including qualification
- Evidence needed
- Framework submission, audited accounts, reference sites
- Route
- Purchase order against a hire agreement, no capital process
- Realistic timescale
- Same season, often under two weeks
- Evidence needed
- Hire terms, insurance, event electrical method statement
Every document, and whether we hold it today.
Held means it exists now and issues with a quotation. Site specific means it is written for your layout, because a generic method statement for a lift onto a live pavement is worthless.
- Detail
- 10m GBP, certificate issued with every quotation
- Status
- Held
- Detail
- 5m GBP, covering unattended low-voltage public charging
- Status
- Held
- Detail
- 10m GBP statutory cover for the Manchester line
- Status
- Held
- Detail
- Delivery, lift, ballast and commissioning, written per site layout
- Status
- Site specific
- Detail
- Where the host is a principal contractor under CDM 2015
- Status
- Site specific
- Detail
- Signed at handover, array, pack, outputs and earthing
- Status
- Held
- Detail
- Take-back commitment and material recovery routes
- Status
- Held
- Detail
- Covering grower partners and the module harvest chain
- Status
- Held
- Detail
- Scored against Greater Manchester TOMs, calculation shown
- Status
- Held
- Detail
- ISO 9001 aligned, gap analysis and corrective action log published
- Status
- Held
Scored the way a Greater Manchester buyer actually scores it.
Social value is often the difference between two technically compliant bids. An importer cannot score local employment or city-region supply chain spend. We can, and here is the measure each claim answers.
- Our claim
- Manufacture and assembly within Greater Manchester
- Evidence
- 2 direct FTE per 400 benches, evidenced by payroll postcode
- Our claim
- One apprentice per production shift added
- Evidence
- Level 3 engineering apprenticeship, GM college partner
- Our claim
- Composite compounding, tooling and steel sourced in the North West
- Evidence
- 68 percent of unit cost retained in the city region
- Our claim
- 312 kg CO2e avoided per bench
- Evidence
- Screening LCA against the first bill of materials
- Our claim
- Diverted modules, plastic and tree timber
- Evidence
- 26 kg plastic and 4 modules diverted per bench
- Our claim
- Free public charging and open uptime reporting
- Evidence
- Charging free at point of use, published load priority
What lands on your pavement, and for how long.
Delivered on a 7.5 tonne curtain-sider, offloaded by tail-lift and pallet truck. No crane required.
Two-person install, 90 minutes per bench, no wet trades and no excavation on a surface-ballast install.
Ballast trays fill on site with recycled aggregate, so nothing over 80 kg is manually handled.
Bolt-down option for adopted highway, M12 resin anchors, four fixings, drilling depth 110 mm.
Commissioning on the same visit: array check, pack state, output test, mesh join, host handover and QR label.
Removal is the reverse and leaves no slab, which matters for meanwhile use and event sites.
Where this sits
This pack closes the procurement readiness row on the differentiation roadmap. Terms in full are on the warranty and lifecycle page, and the standards programme is on the compliance matrix.