Deployment planner

Give it an island, a district or a trail. It gives back a count, the gaps, the cost and the calendar.

The scope page answers what a kind of place needs. This answers what your place needs. Choose the shape of the problem, set the dimensions, then set the number of units you can actually fund, because the interesting output is not the ideal plan, it is what a partial budget buys and precisely where it leaves people outside coverage. Costs are Estimated at low volume and the caveats at the bottom of the page are the ones that will move a real number.

16

Units for full coverage of the plan as configured

Estimated

100%

Coverage the funded units achieve

Estimated

44 days

Programme length from go-ahead to acceptance

Estimated
Shape of the problem

An island is an area problem. A trail is a line problem. They are not the same arithmetic.

Canopei WayfarerPlanned by area

An island cannot buy its way onto an operator's network, but it can own a mesh outright. Positions follow radio line of sight and settlement, in that order.

Ridge and headland positions carry the mesh, settlement positions carry the charging. The two lists overlap less than people expect, which is why the planner returns both a coverage figure and a population figure.

Inputs

Area to cover

620 km²

Target spacing between units

5,200 m

Terrain and building shadowing

72 per cent of clear range lost

Population in the footprint

78,000

Units you can fund

60

Install crews working in parallel

2 crews

Units carrying the environment sensor head

100 per cent

Units for full coverage

Estimated

16

At the spacing and shadowing set

Units funded

Estimated

16

Plan fully funded

Coverage achieved

Estimated

100%

Continuous mesh holds

Effective radio range

Estimated

5,760 m

After the shadowing factor

People reached

Estimated

78,000

Inside the covered footprint

People left in the gap

Estimated

0

The number the plan has to justify

Footprint left uncovered

Estimated

0 km²

Where the coverage genuinely stops

Worst walk within a cell

Estimated

2.88 km

Half the achieved spacing

Capital cost

Estimated

£99,220

£6,201 per unit, all in

Running cost

Estimated

£3,776/yr

£236 per bench per year

Ten year total

Estimated

£136,980

Capital plus a decade of running cost

Cost per person reached

Estimated

£1.27

52,560 free charges a year

Estimated
Saved scenarios

Save this plan, then argue with it side by side.

A plan is only useful next to another one. Save an island at full coverage, the same island at half the budget, and a trail, then read the four columns that actually decide a programme: how many units, how much coverage is bought, what each person reached costs, and how long the whole thing takes. Scenarios are held in this browser only, up to 12, and nothing is sent anywhere.

Save the current inputs

Saving the same name twice keeps both and numbers them, so a revised assumption never overwrites the version somebody has already seen.

No scenarios saved yet. Set the inputs above, give the plan a name, and it appears here for comparison.

Coverage map diff

Two plans, the same ground, and exactly where they disagree.

A coverage percentage hides the thing a buyer cares about, which is which part of the island or which stretch of the trail stays dark, and for how long. Pick two saved scenarios, walk the rollout in quarters, and the third grid marks every cell where the two plans differ. The geometry is modelled from spacing and shadowing, not surveyed.

Save at least two scenarios above and the side by side maps appear here.

Cost breakdown

The bench is not the expensive part. Reaching the position is.

On a trail, logistics and a hard anchor can approach the cost of the unit itself, which is why the Wayfarer ships as panels that assemble on site. In a town district both lines collapse and the plan is dominated by hardware.

Bench, delivered
Per unit
£3,650
Total
£58,400
Basis
List price for the flagship unit, before any volume position.
Environment sensor head, fitted
Per unit
£214
Total
£3,424
Basis
Bill of materials at low hundreds of units, plus 25 minutes of fitting.
Survey and siting
Per unit
£180
Total
£2,880
Basis
Per position: shading study, radio line of sight check and ground assessment.
Install and fixing
Per unit
£1,257
Total
£20,116
Basis
Blended across 10 standard and 6 hard positions, the latter at 1.9 times for access or anchoring.
Logistics to position
Per unit
£780
Total
£12,480
Basis
Kind specific. Highest on a trail, where the unit is carried in as panels.
Commissioning and acceptance
Per unit
£120
Total
£1,920
Basis
Pairing onto the mesh, lane test, energy test and the signed acceptance sheet.

£99,220

Capital cost of the funded plan

Estimated

35%

Hard positions in the plan

Estimated

1.9x

Install uplift on a hard position

Estimated
Timeline

Four phases, and consents are the risk, not installation.

1.Design, permissions and mobilisation

30working days

Position list agreed, landowner or highway consents raised, radio band checked against local licensing, first units allocated from the line.

2.Survey

2working days

Six positions a crew day: shading, line of sight to the neighbouring node, ground and anchor decision, and the hard-position flag that drives install cost.

3.Install

7working days

1.5 units per crew day on this kind of site, 2 crews working, plus an 18 per cent weather and access allowance.

4.Commission and accept

5working days

Mesh pairing across the whole fleet, both lanes proven, seven days of telemetry reviewed, then handover with the per-serial build record.

7

Install working days

Estimated

44 days

Programme length, go-ahead to acceptance

Estimated

1.5

Units per crew day on this site kind

Estimated
What the planner does not know

The limits, published before a buyer trips over them.

Coverage here is modelled from spacing and a shadowing factor, not from a terrain profile. A real island plan needs a line of sight study against elevation data, and that study will move positions.

Consents are the schedule risk, not installation. The mobilisation phase is a flat 30 days on this model and it is the line most likely to be wrong on a public highway.

Costs are Estimated at low volume. Install and logistics both fall materially with a repeat programme in one geography.

Radio licensing differs by country. Where a licence is required for the mesh band, a unit ships with that radio disabled until the licence is held, and the coverage figure on this page does not apply until it is.

No figure on this page has been proven by a deployed fleet, because none is deployed yet.